Hi all
We are planning to do a update on our ECC from EHP6 to EHP7
I want to use the nZDM option to keep downtime as small as possible
However, the system has SLT replication running where the ECC system is the source system
Is it possible to have these 2 running together
From the operations guide I gather we will probably need stop replication and start new with initial load after the update is done.
From what I gather from the nZDM documentation , is that nZDM also uses internal replication (based also on triggers) to build and maintain the shadow instance
But I like to know if the SLT replication is still possible while the shadow instance is being build