Hello Experts, I have a question about STL. We have a BW on HANA 7.4 with SP09. It's possible configure and install the SLT within of BW server and after connect with ODP SLT to SAP ECC?. Or SLT only it's posible install and configure into a separate server and SAP ECC?
Thanks.